Get our drawings before the slab is poured.
We engage at the electrical drawing stage — conduit routing, switch placement, gang counts, panel sizing — coordinated with your drawings before any site work begins.
Partner with us.
Keep the markup.
Skip the risk.
Spec sheet, no strings
We hand you the full automation spec: conduit sizes, gang counts, panel sizing, protocol selection. Your BOQ, your markup.
On-site before the slab
We're at the drawing stage before any conduit goes in. No retrofitting. No surprises. No compromise to your design.
One number for everything
Install, program, commission, warranty. One team. We handle the AV contractor, electrician, and site supervisor.
The automation spec sheet.
One A4 page covering KNX wired infrastructure — conduit specs, gang sizes, panel sizing, voltage drops. No email gate. Take it.
Download spec sheet — PDF, A4Version dated May 2026 · WhatsApp us if you need an updated copy
How we work with architects.
You share your electrical drawings.
We study conduit routes, switch positions, panel location.
We send the coordination layer.
Revised conduit sizing, additional gang requirements, panel spec. Ready for your site engineer.
We stay through commission.
Programming, scene setup, handover documentation. You get the credit. We get the referral.
Ready to spec?
WhatsApp us now. We'll set up a 20-min technical call.
Spec with us on WhatsApp